SR-32 Shared Use Path 

In 2022, Summit County set out to complete a years old project of connecting Oakley to Kamas with a paved path parallel to SR-32. A little over a mile was constructed from 2700N to 1500N with two additional phases planned for the 2024 construction season. Phase 2 will extend from 1500N to 300N and Phase 3 will connect 503S in Kamas to SR-35 in Francis.  

Old Ranch Road Side Path 

In 2024, Summit County plans to improve a section of Old Ranch Road and install a paved trail between the Old Ranch Road Trailhead and Willow Creek Park. Once installed, there will be a complete bicycle route from SR-224 to Highland Drive. 

Millenium Trail 

As part of the Bus Rapid Transit (BRT) project currently planned to start construction in 2024, Summit County will construct a 10' wide paved transportation trail parallel to SR-224. The trail will serve as a connector segment on the west side of the State Highway between the Hyatt and other pedestrian infrastructure on Canyons Resort Drive. 

  1. Summit County Utah Homepage

Contact Us

  1. 60 N Main Street
    P.O. Box 128
    Coalville, UT 84017

    Phone: 435-336-3200
Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow